Description
A63-30-11 ABB Processor module
Brand:ABB Model number:A63-30-11
Colour:new Warranty: 12 months
Lead Time:3-day working day Country of origin: Sweden
Price: Please contact us Product weight:2.145kg
Shipping Port: Xiamen, China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
Product details:
Rev.17 of the 56F803 Datasheet has two parts:
• The addendum to revision 16 of the datasheet, immediately following this cover page.
• Revision 16 of the datasheet, following the addendum. The changes described in the addendum have
not been implemented in the specified pages.
A complicating factor is the existence of three common definitions for determining the junction-to-case
thermal resistance in plastic packages:
• Measure the thermal resistance from the junction to the outside surface of the package (case)
closest to the chip mounting area when that surface has a proper heat sink. This is done to minimize
temperature variation across the surface.
• Measure the thermal resistance from the junction to where the leads are attached to the case. This
definition is approximately equal to a junction to board thermal resistance.
• Use the value obtained by the equation (TJ – TT)/PD where TT is the temperature of the package
case determined by a thermocouple.
The thermal characterization parameter is measured per JESD51-2 specification using a 40-gauge type T thermocouple epoxied to the top center of the package case. The thermocouple should be positioned so that the thermocouple junction rests on the package. A small amount of epoxy is placed over the ther mocouple junction and over about 1mm of wire extending from the junction. The thermocouple wire is placed flat against the package case to avoid measurement errors caused by cooling effects of the thermocouple wire.
When heat sink is used, the junction temperature is determined from a thermocouple inserted at theinterface between the case of the package and the interface material. A clearance slot or hole is normally required in the heat sink. Minimizing the size of the clearance is important to minimize the change in thermal performance caused by removing part of the thermal interface to the heat sink. Because of the experimental difficulties with this technique, many engineers measure the heat sink temperature and then back-calculate the case temperature using a separate measurement of the thermal resistance of the interface. From this case temperature, the junction temperature is determined from the junction-to-case thermal resistance.
This document and parts thereof must not be reproduced or copied without written permission from ABB, and the contents thereof must not be imparted to a third party, nor used for any unauthorized purpose.
Trademarks ABB and Relion are registered trademarks of the ABB Group. All other brand or product names mentioned in this document may be trademarks or registered trademarks of their respective holders. Warranty Please inquire about the terms of warranty from your nearest ABB representative
The data, examples and diagrams in this manual are included solely for the concept or product description and are not to be deemed as a statement of guaranteed properties. All persons responsible for applying the equipment addressed in this manual must satisfy themselves that each intended application is suitable and acceptable, including that any applicable safety or other operational requirements are complied with. In particular, any risks in applications where a system failure and/or product failure would create a risk for harm to property or persons (including but not limited to personal injuries or death) shall be the sole responsibility of the person or entity applying the equipment, and those so responsible are hereby requested to ensure that all measures are taken to exclude or mitigate such risks
This product has been designed to be connected and communicate data and information via a network interface which should be connected to a secure network. It is the sole responsibility of the person or entity responsible for network administration to ensure a secure connection to the network and to take the necessary measures (such as, but not limited to, installation of firewalls, application of authentication measures, encryption of data, installation of anti virus programs, etc.) to protect the product and the network, its system and interface included, against any kind of security breaches, unauthorized access, interference, intrusion, leakage and/or theft of data or information. ABB is not liable for any such damages and/or losses.
We have the same series of models in stock. If you don’t find the model you need, please contact us and we will provide you with an official quotation!
Colour:new Warranty: 12 months
Lead Time:3-day working day Country of origin: Sweden
Price: Please contact us Product weight:0.515kg
Shipping Port: Xiamen, China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
The following are other related models. If you can’t find the product you need, please contact us. Thank you
ABB 1VCF750090R0802
ABB RDCO-03C
ABB ACS355-03E-04A1-4
ABB ACS355-03E-07A3-4
ABB F374-40/0.03
ABB S201M-C6
ABB A40-30-10
ABB 1SAZ301110R0001
ABB 1SBN010010R1001
ABB 1SBN010010R1010
ABB S253-C63
ABB S254-C63
ABB 2CDS251001R0104
ABB 2CDS251001R0467
ABB NRED-61
ABB AOFC-02
ABB D2D160-BE02-11
ABB ATMB-01C
ABB INNPM12
ABB ACS355-03E-08A8-4
ABB ICSA04B5
ABB NGPS-02C
ABB 1SFA892008R1002
ABB MOD600APSMH07
- Full 12-month warranty on all components
- Dedicated after-sales support
- Same-day dispatch on 1000s of parts
- All units are fully tested
- 1. Email confirmation
You will get an email confirming that we have received your enquiry. - 2. Dedicated Account Manager
One of our team will be in touch to confirm your part(s) specification and condition. - 3. Your quote
You will receive a comprehensive quote tailored to your specific needs.